1. Size and projection
Width sets how much steel and deck you buy. Projection (how far it sticks out from the wall) matters even more, because a deeper cantilever puts more load on the frame and the wall connection. A modest increase in projection can mean heavier members and bigger connections.
2. How it is supported
A canopy can cantilever off the wall, hang from tie rods or hanger rods anchored above, or sit on posts with footings. Each changes the steel, the connections, and the site work. Posts add foundations and may run into utilities or sidewalks; rods add attachment points higher on the facade. See the options on our steel canopies page.
3. What it bolts to
The wall is often the deciding factor. Tilt-wall concrete, CMU block, steel framing, wood framing, and brick veneer all need different anchors and sometimes added blocking or embeds. Brick veneer is not structure; the canopy has to reach the backup wall behind it. An unknown wall is the biggest source of surprises, which is why we check it on the site visit.
4. Engineering and permitting
The building code requires awnings and canopies to be designed for wind and live loads (IBC Section 3105), using the wind provisions of the structural chapter (IBC Chapter 16). Sealed drawings, permit fees, and any right-of-way license are real costs and real time. Our Austin awning permit guide explains when each applies.
5. Deck, drainage, and lighting
A metal deck with gutters and downspouts controls water at the door. Soffit panels, recessed lighting, and wiring for signage add finish and require a licensed electrician. Decide on these before fabrication so the steel can be detailed for them.
6. Finish
Primer only, a shop-applied urethane system, or hot-dip galvanizing all protect the steel at different levels. Central Texas sun and moisture at the wall line make the coating worth choosing deliberately.
7. Access and the site
Lift access, traffic, working hours at an open business, and how far the crew has to carry steel all affect install time. Night or weekend work at a busy storefront is possible but adds cost.
How to compare bids
Ask every bidder to state the support type, member sizes, wall connection method, whether engineering and permit are included, drainage, finish system, and lighting. A low number that leaves out engineering or the permit is not a lower price. Every Stealth proposal is itemized with one lump-sum total, so you can see exactly what is included.